The existing non-skid surface was deteriorating and breaking up. Hy Spec applied a new, cold applied non-skid surfacing to the bridge deck to provide a safer surface to walk on. The footbridge was closed for a couple of days for these works to be carried out, keeping closure time and disruption to a minimum.